HEAD OF DIVISION
Ing. Marek Bárdy, Ph.D.
Phone: +420 775 502 774
E-mail: bardy@cie-group.cz
LinkedIn: @ciebardy
We are an implementation and consulting company focused on industrial production. Our experts will professionally help you with problems in increasing the efficiency and performance of systems thanks to the use of modern technologies.
We make sure that the design of the solution is well applicable and brings the desired effect. We achieve great results thanks to a combination of many years of experience of our experts and flexibility. Our customers are mainly industrial companies, but also public sector institutions. Thanks to our expertise in this area, we are the only official partner of the University of West Bohemia in Pilsen.
Using the industrial engineering, experience from more than 200 implemented projects and our own innovations in the field of production, we design and implement changes that demonstrably increase the efficiency and effectiveness of the production process.
For standard operations, we set work standards using world-renowned measurement methods (REFA, MOST and MTM). For non-standard operations (high variability / long duration) we use our own tool: Standards calculator, developed by the CIE team.
We develop our own applications with the help of world-renowned software manufacturers (Microsoft and Siemens). The outputs from these applications demonstrably increase the efficiency of production process management, which will be reflected in increased production performance and resource savings.
With the help of experience from more than 150 implemented projects, modern software and our own innovations in the field of spatial arrangement of production and logistics operations, we design and implement effective and long-term solutions for new halls, as well as changes to existing facilities.
With experience from more than 100 implemented projects, modern software and our own innovations in the field of internal logistics, we design and implement solutions that will be reflected in the efficient and flexible use of human resources and the technology used.
With the help of experience from more than 150 implemented projects, we design and implement solutions that are aimed at eliminating waste in the process and administrative provision of the production and support activities of the company.
"In our cooperation with CIE, I appreciate the friendly and open communication on the one hand, and the highly professional approach both in defining the assignment and the actual implementation of projects (analysis of workplace ergonomics, creation of software for the standardization of work and production planning times). I see the advantage in cooperation with CIE especially in the wide range of expert technical/IT competencies and knowledge that the people in CIE have, and thus no problem seems to be a problem."
Phone: +420 775 502 774
E-mail: bardy@cie-group.cz
LinkedIn: @ciebardy